2019

Latest Updates Mission Antyodaya survey for 2019 has been completed and data for 98 % GPs (2,65,031) has been collected .

Villagewise Report On Infrastructure (No. Of Villages)

State Name No. of
Villages
Where Survey
completed
Total
Population
Male Female Total
Household
Availability
of banks
if bank is not available in the village;
the distance to the nearest bank
Availability
of Business
Correspondent
with internet
connectivity
Availability
of
ATM
Availability
of Internet/
Broadband Facility
Whether the
village is
connected to All
weather road
Whether village has internal
pucca roads
(cc/ brick road)
Availability of Public Transport Availability
of
Railway
Station
Availability of Common Service Centre Availability of electricity for domestic use Availability
of
electricity Supply
to
MSME Units
Availability of
Public Distribution
System (PDS)
Availability of markets Availability of Piped tap water Availability of telephone services Total no of
household using
clean energy
(LPG/Bio gas)
Use of
Solar Energy/
Wind Energy
for electrification
of the house
No of household
with kuccha wall
and
kuccha roof
Availability of
Post office/
Sub-Post office
Availability
of
Panchayat
Bhawan
Availability of Public
Information Board
Availability of school Availability
of
Public
Library
Availability of recreational centre/
Sports Playground
Availability of
Vocational
Educational centre
/ITI/RSETI/DDU-GKY
Availability of Sub centre If Sub Centre is not available in the village,
distance of the nearest place where facility
is available
Availability of
Veterinary
Clinic Hospital
If Veterinary Clinic not available in the
village, distance of the nearest
place where facility is available
Availability of drainage facilities Common
pastures
< 1
km
1-2
km
2-5
km
5-10
Km
>10
Km
Fully
covered
Partially
covered
Not
covered
Bus Van Auto Not
available
Co-located
with Panchayat
Bhawan
Separately
located
Not
available
1-4
hrs
4-8
hrs
8-12
hrs
>12
hrs
No
electricity
Mandis Regular
market
weekly
haat
Not
available
100%
habitations
covered
50-100%
habitations
covered
< 50%
habitation
covered
only one
habitation
is covered
not
covered
Landline Mobile Both none Not
Available
Available
and
updated
Available
but not
updated
Primary
School
Middle
School
High
School
Higher/Senior
Secondary
School
Degree
College
school and Degree
college
not available
Indoor Outdoor Both None CHC PHC Sub
Centre
Not
available
< 1
km
1-2
km
2-5
km
5-10
Km
>10
Km
< 1
km
1-2
km
2-5
km
5-10
Km
>10
Km
Closed
drainage
open pucca
drainage
covered with
tiles slab
open pucca
drainage
uncovered
open kuccha
drainage
no
drainage